Pool Construction Phases: What Homeowners Decide and Do at Each Step

Most guides to pool construction phases describe what the crew does: dig, set steel, spray gunite, apply the finish. That’s useful, but it skips your side of the job. Several phases can’t move forward until you approve a layout, clear access to the yard or have the barrier ready for an inspection.

Miss one of those moments and the schedule slips, or a change lands after concrete is poured. This guide walks through each phase from the homeowner’s side, using the requirements Phoenix-area homeowners actually run into, so you know what to have ready before the crew shows up.

Key Takeaways

  • Most pool construction phases need something from you: a design sign-off, HOA approval, clear access, or a ready barrier for inspection.
  • In Phoenix, a new pool gets two city inspections, pre-gunite and pre-plaster, and the pool barrier is checked at the pre-plaster visit.
  • Arizona law requires an 811 utility locate before digging, and the utility marks its own lines, so point out irrigation, lighting and gas lines you added.
  • Design changes are cheapest on paper. Once steel and plumbing are set, moving a step, jet or light means rework.
  • Most of our pool construction projects take eight to twelve weeks, with exact timing set by design complexity, permits and weather.

What Are the Pool Construction Phases, and Where Do You Come In?

Pool construction phases are the stages a custom pool moves through from drawing to first swim: design and permits, layout and excavation, steel and plumbing, the gunite shell, tile and decking, the barrier inspection, and the interior finish and startup. Your role is heaviest at the start and the end, with a few key check-ins in between.

The table below pairs each phase with what you’ll be asked to do, so you can treat the pool building process as a checklist. Our pool construction process post covers the crew’s side of each stage in more detail.

PhaseWhat the crew doesWhat you do
Design and permitsDrawings, engineering and permit submittalApprove the layout, features and finishes; get HOA approval
Layout and excavationMarks the pool outline and digsConfirm placement on the ground; clear access; flag private lines
Steel and plumbingSets rebar and runs plumbing and electricalLast check on step, bench, jet and light locations
Gunite shellSprays the concrete shellKeep kids and pets away from the open shell
Tile, coping and deckingSets tile and coping, then pours or lays the deckConfirm tile, coping and deck selections are final
Barrier inspectionCoordinates the pre-plaster inspectionHave fencing, gates and doors ready; be home if required
Interior finish and startupApplies the finish, fills and starts equipmentAttend the startup walkthrough and learn the care routine

What Should You Settle Before the First Pool Construction Phase Starts?

Settle every design choice you can before the first of the pool construction phases begins, because each change after excavation costs more than the one before it. Good pool planning also covers the paperwork: your HOA’s approval, a contract that spells out the work, and a license you’ve checked yourself.

Freeform backyard pool with a boulder accent, blue waterline tile and a stone deck

Our 3D renderings help here, since you can see step locations and sightlines before anything is dug. Lock in these details during design:

  • Pool shape, depth and the location of steps, benches and any tanning ledge
  • Number and placement of pool, spa and landscape lights
  • Where the equipment pad sits, and how far it is from bedrooms and patios
  • Tile, coping, decking and interior finish colors
  • Features such as a spa, waterfall or fire bowls, so plumbing and gas are planned once

On the paperwork side, the Arizona Registrar of Contractors’ before-you-hire guidance tells homeowners to review the contractor’s license record, put a detailed description of every part of the project in the contract, and not let payments get ahead of the work. If you live in an HOA community, start that approval early. As West Valley pool builders, we see many communities in Glendale, Peoria, Surprise and Goodyear with their own requirements for pool projects.

What Do Pool Building Steps Like Excavation and Steel Require From You?

The early pool building steps need three things from you: clear access to the backyard, a final yes on the pool’s position once it’s marked on the ground, and a heads-up about anything buried in the yard. After steel and plumbing go in, the layout is effectively set, so this is your last easy chance to adjust it.

Concrete pool shell under construction with excavated soil behind it

Before anyone digs, Arizona requires a call to 811. Under the state’s underground facilities law, the utility marks the location of its lines for free, and excavation can’t begin until all utilities have been marked. The utility marks its own lines, not the ones you or a past owner added. Tell your builder about sprinkler lines, low-voltage lighting, a gas line to a grill or fire pit, or a buried line to a shed.

Clear the side yard and gate area so equipment can get through, move pots and furniture out of the work zone, and turn off irrigation zones near the dig. Once the gunite shell is sprayed, the yard becomes a job site with an open hole in it, so keep kids and pets well away until the barrier is complete.

How Do Pool Barrier Requirements and Inspections Work in Phoenix?

In Phoenix, pool barrier requirements are checked during construction, not after. The city runs two inspections on a new pool, one before gunite and one before plaster, and the barrier is inspected at the pre-plaster visit. If the barrier isn’t ready, that inspection can’t pass, and the interior finish waits.

Two workers in safety vests checking concrete forms on a construction site

The city’s barrier requirements handout calls for a fence five feet high measured from the outside, with no opening a four-inch ball can pass through. If your house wall forms part of the barrier, doors leading to the pool area must be self-closing, self-latching and swing outward, and an adult must be present during the inspection if minors or belongings are in the home.

We manage the permits and coordinate every inspection, but the barrier sits on your property, so walk it with us before the pre-plaster date. Rules differ by city, so if you’re outside Phoenix, ask which version applies to your address.

Pool Construction Phases FAQs

What Is the Correct Order for Building a Pool?

The usual steps to building a pool run in this order: design and permits, layout and excavation, steel and plumbing, the gunite shell, tile and coping, decking, the barrier inspection, the interior finish, then fill and startup. Each phase depends on the one before it, and inspections have to pass before the next stage can be covered up.

What Are the Stages of a Gunite Pool Construction Process?

A gunite pool construction process starts with excavation, then a steel rebar cage and plumbing set inside the hole. A pneumatic hose sprays concrete over the steel to form the shell, which then cures. Tile, coping, decking and the interior finish follow, and the pool is filled and started last.

Do I Need to Be Home During Pool Construction?

Not most days. You’ll want to be there when the pool layout is marked, so you can confirm its position, and at the startup walkthrough. In Phoenix, an adult must also be present at the barrier inspection if your house wall is part of the barrier and minors or belongings are inside.

How Should I Prepare My Yard for Pool Construction?

Clear a path for equipment through the gate or side yard, move furniture, pots and anything fragile out of the work area, and turn off nearby irrigation zones. Point out private buried lines such as sprinklers, lighting or gas runs, and make arrangements to keep pets and kids out of the yard while it’s an active job site.

What Happens at Pool Startup?

At startup, the pool is filled, the equipment is turned on and the water is balanced. We walk you through care instructions at final startup and recommend a maintenance schedule, so you leave knowing how the pump, filter and controls work and what the first weeks of care look like.

Planning Your Pool Construction Phases With Our Team

The decision in front of you is how much to settle before digging starts. The more you lock in during design, the smoother the pool construction phases run, and the fewer pool construction steps have to be redone after concrete is poured.

We’ve been designing and building custom pools across the North and West Valley since 2001, and our page on pool construction in Phoenix covers how we manage permits, inspections and each build stage. When you’re ready, talk through your build schedule with us or call (602) 787-1603.